Skip to content

IWCF L4 Well Control Drill

Run a 30-minute IWCF Level 4 well control drill — the agent plays the examiner and walks you through kick detection, shut-in, circulation, and well kill procedures using industry-standard methodology (IADC, API).

Type: Skill (agent-driven, interactive) Domain: HSE Vertical: IWCF L4 Version: v1.0.0 Last tested: 2026-06-03 Cost per run: ~$0.02 (DeepSeek tokens)

:material-github: Source on GitHub · Drive canon · CHANGELOG

Trigger prompts

Start a 30-minute IWCF L4 well control drill on Driller's Method.
Use skill-iwcf-l4-drill. Scenario: kick detected at 8,500 ft on a 12.5 ppg mud, 9.5 ppg kick.
Quick drill: shut-in procedure + 5 strike questions on strip-and-kill pressures.

What it produces

A scored drill session (markdown file) saved to ~/iwcf-drills/:

  • 1 scenario (drilling / tripping / cementing)
  • 6-10 strike questions (shut-in, strip, kill, circulate)
  • 1 final essay question (well kill plan)
  • Score: 0-100, broken down by topic
  • Weak areas identified
  • Recommendations for next drill

Sample output — IWCF L4 Drill 2026-06-03

# IWCF L4 Drill — 2026-06-03 — Drilling Kick at 8,500 ft

## Scenario
- Depth: 8,500 ft MD / 8,200 ft TVD
- Mud: 12.5 ppg OBM
- Casing: 9.625" @ 5,000 ft
- Open hole: 8.5"
- Kick: 9.5 ppg, gas-cut
- BOP: 13.5", annular + 3 ram preventers

## Score: 78/100

| Topic | Score | Notes |
|---|---|---|
| Kick detection | 9/10 | Caught pit gain first, missed flowline temp |
| Shut-in procedure | 8/10 | Correct: soft shut-in, but slow on first action |
| Strip-and-kill | 7/10 | SIDPP/SICP correct, MAASP calculation off by 50 psi |
| Kill method | 9/10 | Correct: Wait-and-Weight for deep well |
| Kill sheet | 7/10 | FCP off, stroke count missed |
| Circulate | 10/10 | Perfect |

## Weak areas
1. MAASP calculation — review burst rating × safety factor
2. Kill sheet FCP formula — practice the ΔP × TVD derivation
3. Stroke count = (total vol to circulate) / (pump output per stroke)

## Recommended next drill
- Repeat with deeper kick (12,000+ ft) and gas-cut scenario
- Practice MAASP under different casing burst ratings

Workflow (8 stages, ~30 min wall clock)

# Stage Time What happens
1 Scenario setup 2 min Agent proposes scenario; user accepts or modifies
2 Kick detection 3 min 3 indicators — pit gain, flowline temp, return flow
3 Shut-in procedure 3 min Hard vs. soft shut-in (IWCF L4: soft preferred for floating rigs)
4 Strip-and-kill 5 min SIDPP, SICP, MAASP, ICP calculations
5 Kill method 3 min Driller's Method vs. Wait-and-Weight (deep wells: W&W)
6 Kill sheet 5 min Mud weight to kill, FCP, stroke count
7 Circulate 5 min Stroke-by-stroke, watch for gas / pressure trends
8 Final assessment 4 min Score, weak areas, 3 recommendations

Source files

File Path Version
Source methodology drive/00-canon/hse/iwcf-l4/drill/00-iwcf-l4-drill-v1.0.0-2026-06-03.md v1.0.0
Lead skill canon/hse/iwcf-l4/drill/SKILL.md v1.0.0
CHANGELOG canon/hse/iwcf-l4/drill/CHANGELOG.md v1.0.0
Public skill skills/skill-iwcf-l4-drill/SKILL.md v1.0.0

Install

# Drop into your Hermes skills folder
cp -r skills/skill-iwcf-l4-drill/ ~/.hermes/skills/
# /reload-skills

Version + last tested

  • v1.0.0 — released 2026-06-03
  • Last tested: 2026-06-03 — 30-min drill on a kick at 8,500 ft. Scored 78/100. Weak area: MAASP under variable casing ratings. Recommended: re-drill at 12,000+ ft with gas-cut.

Known limitations

  • Kill sheet math is approximate (uses simplified BHCT model).
  • Scoring rubric is built into the skill, not externally calibrated to IWCF exam weights.

← HSE · Library · Home